{"id":1079,"date":"2023-05-22T15:06:08","date_gmt":"2023-05-22T13:06:08","guid":{"rendered":"https:\/\/www.odvodnja-zabok-zlatar.hr\/?p=1079"},"modified":"2023-05-22T15:06:12","modified_gmt":"2023-05-22T13:06:12","slug":"visit-to-the-construction-site-as-part-of-the-projectconstruction-of-wastewater-collection-and-drainage-system-zabok-drainage-system-and-zlatar-drainage-system-3","status":"publish","type":"post","link":"https:\/\/www.odvodnja-zabok-zlatar.hr\/en\/news\/visit-to-the-construction-site-as-part-of-the-projectconstruction-of-wastewater-collection-and-drainage-system-zabok-drainage-system-and-zlatar-drainage-system-3\/","title":{"rendered":"Visit to the construction site as part of the Project<br>&#8220;CONSTRUCTION OF WASTEWATER COLLECTION AND DRAINAGE SYSTEM, ZABOK DRAINAGE SYSTEM AND ZLATAR DRAINAGE SYSTEM&#8221;"},"content":{"rendered":"\n<p>In Tugonica (Marija Bistrica municipality), on May 22, 2023, a visit to the construction site was held to present the progress of the works as part of the Project &#8220;CONSTRUCTION OF THE WASTEWATER COLLECTION AND DRAINAGE SYSTEM OF THE ZABOK DRAINAGE SYSTEM AND THE ZLATAR DRAINAGE SYSTEM&#8221;. The contractor for the contracts in question is the community of bidders: CGP d.d., NGH Grupa d.o.o. and RICO d.o.o. The work is performed by NGH Grupa d.o.o. The current implementation of the works is as follows:<\/p>\n\n\n\n<p>LOT III:<br>\u2022 Collectors \u2013 27,689.51 m (46.62%)<br>\u2022 Audit windows \u2013 841 pcs (45.26%)<br>\u2022 Home connections &#8211; 491 pcs (32.86%)<br>\u2022 Pumping stations \u2013 5 pcs (21.74%)<br>\u2022 Overflow buildings \u2013 2 units (18.18%)<\/p>\n\n\n\n<p>MARIJA BISTRICA phase I:<br>\u2022 Collectors \u2013 7,041.00 m (44.59%)<br>\u2022 Audit windows \u2013 236 pcs (44.20%)<br>\u2022 Home connections &#8211; 166 pcs (17.98%)<\/p>\n\n\n\n<p>MARIJA BISTRICA phase II:<br>\u2022 Collectors \u2013 610.83 m (11.21%)<br>\u2022 Audit windows \u2013 26 pcs (14.75%)<br>\u2022 Home connections \u2013 39 pcs (50%)<\/p>\n\n\n\n<figure class=\"wp-block-gallery has-nested-images columns-default is-cropped wp-block-gallery-1 is-layout-flex wp-block-gallery-is-layout-flex\">\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"683\" data-id=\"1075\" src=\"https:\/\/www.odvodnja-zabok-zlatar.hr\/wp-content\/uploads\/2023\/05\/vodovod-5_5472x3648-1024x683.jpeg\" alt=\"\" class=\"wp-image-1075\" srcset=\"https:\/\/www.odvodnja-zabok-zlatar.hr\/wp-content\/uploads\/2023\/05\/vodovod-5_5472x3648-1024x683.jpeg 1024w, https:\/\/www.odvodnja-zabok-zlatar.hr\/wp-content\/uploads\/2023\/05\/vodovod-5_5472x3648-300x200.jpeg 300w, https:\/\/www.odvodnja-zabok-zlatar.hr\/wp-content\/uploads\/2023\/05\/vodovod-5_5472x3648-768x512.jpeg 768w, https:\/\/www.odvodnja-zabok-zlatar.hr\/wp-content\/uploads\/2023\/05\/vodovod-5_5472x3648-1536x1024.jpeg 1536w, https:\/\/www.odvodnja-zabok-zlatar.hr\/wp-content\/uploads\/2023\/05\/vodovod-5_5472x3648-2048x1365.jpeg 2048w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n<\/figure>\n\n\n\n<figure class=\"wp-block-embed is-type-video is-provider-youtube wp-block-embed-youtube wp-embed-aspect-16-9 wp-has-aspect-ratio\"><div class=\"wp-block-embed__wrapper\">\n<iframe loading=\"lazy\" title=\"22 05 23 Tugonica i vodosprema\" width=\"500\" height=\"281\" src=\"https:\/\/www.youtube.com\/embed\/7NXo__ZKoAI?feature=oembed\" frameborder=\"0\" allow=\"accelerometer; autoplay; clipboard-write; encrypted-media; gyroscope; picture-in-picture; web-share\" referrerpolicy=\"strict-origin-when-cross-origin\" allowfullscreen><\/iframe>\n<\/div><\/figure>\n","protected":false},"excerpt":{"rendered":"<p>In Tugonica (Marija Bistrica municipality), on May 22, 2023, a visit to the construction site was held to present the progress of the works as part of the Project &#8220;CONSTRUCTION OF THE WASTEWATER COLLECTION AND DRAINAGE SYSTEM OF THE ZABOK DRAINAGE SYSTEM AND THE ZLATAR DRAINAGE SYSTEM&#8221;. The contractor for the contracts in question is [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":1077,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"_seopress_robots_primary_cat":"none","_seopress_titles_title":"","_seopress_titles_desc":"","_seopress_robots_index":"","footnotes":""},"categories":[11],"tags":[],"class_list":["post-1079","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news"],"acf":[],"_links":{"self":[{"href":"https:\/\/www.odvodnja-zabok-zlatar.hr\/en\/wp-json\/wp\/v2\/posts\/1079","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.odvodnja-zabok-zlatar.hr\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.odvodnja-zabok-zlatar.hr\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.odvodnja-zabok-zlatar.hr\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.odvodnja-zabok-zlatar.hr\/en\/wp-json\/wp\/v2\/comments?post=1079"}],"version-history":[{"count":1,"href":"https:\/\/www.odvodnja-zabok-zlatar.hr\/en\/wp-json\/wp\/v2\/posts\/1079\/revisions"}],"predecessor-version":[{"id":1082,"href":"https:\/\/www.odvodnja-zabok-zlatar.hr\/en\/wp-json\/wp\/v2\/posts\/1079\/revisions\/1082"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.odvodnja-zabok-zlatar.hr\/en\/wp-json\/wp\/v2\/media\/1077"}],"wp:attachment":[{"href":"https:\/\/www.odvodnja-zabok-zlatar.hr\/en\/wp-json\/wp\/v2\/media?parent=1079"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.odvodnja-zabok-zlatar.hr\/en\/wp-json\/wp\/v2\/categories?post=1079"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.odvodnja-zabok-zlatar.hr\/en\/wp-json\/wp\/v2\/tags?post=1079"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}